On 3/26/13 12:40 PM, Robert Elz wrote:
Date: Tue, 26 Mar 2013 11:58:19 -0700
From: Jeff Rizzo <riz%NetBSD.org@localhost>
Message-ID: <5151EFCB.6060002%NetBSD.org@localhost>
| Realistically speaking, 6.1 release is 2-3 weeks away. There will
| likely be an RC3 by the end of this week(ish).
Doesn't there need to be a netbsd-6-1 branch before 6.1 gets all that
close to being released? As best I can tell that hasn't happened yet.
No, the branch happens *after* release, for maintenance. 6.1_RC2 came out last week. (Full disclosure: I'm heading up the 6.1 release :)
+j